The project involves the supply, installation, and commissioning of an ADS equipment package for the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus, encompassing design, manufacturing, assembly, and testing.
H3AT ADS. The Supply of an ADS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. Sub-system Package – the package scope of work includes design, manufacture, assembly, Factory Acceptance Testing, delivery, supply, installation, Site Acceptance Testing and commissioning.
The Supply of an ADS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. Sub-system Package – the package scope of work includes design, manufacture, assembly, Factory Acceptance Testing, delivery, supply, installation, Site Acceptance Testing and commissioning. Design – the package is to be produced by the Contractor and must support and contain the process equipment. Contractor is to identify tie-in connection points to process services as well as main process connections, process line and EC&I connections. Manufacturing, FAT, Delivery, Installation and SAT – the package requires manufacture, assembly, installation, and SAT. This involves delivery and installation of all the equipment fabricated/procured by the Contractor to include provision of interface control and electrical distribution boxes and specific tie points for proce