The outdoor swimming pool, built in the early 1970s, has been in need of major renovation and modernization after more than 40 years of operation.
This affects the buildings, the technical equipment and the outdoor facilities.
Design approach:
Generally:
- In order to make the operation of the outdoor swimming pool more economical, the water area is currently approx
- The terrace character of the outdoor pool should be preserved,
- complete renovation of the outdoor facilities,
- Construction of a new filter building.
Trade 07: Steel construction work - consisting mainly of the following services:
- approx. 1 200.00 kg 17 steel tubes 101.6 x 8 mm, l approx.3.60 in the socket foundation,
- Install approx. 950.00 kg HEA-120 girders (approx. 46 m) on tubular steel supports,
- Install approx. 1,000.00 kg of IPE 80/100 profiles 32 pieces, each 4.15 m long, as rafters and shading elements,
- approx. 26.00 m
- 7.00 side glazing with rectangular profiles, L-profiles and laminated safety glass,
- 5 pieces 2.20 x 1.85 m, 2 pieces 1.70 x 1.85 m,
- 3.00 frame made of rectangular profiles as a substructure for wood paneling,
- 2 pieces 2.20 x 1.85 m, 1 piece 1.70 x 1.85 m.