Extension and general refurbishment of the vocational school Wasserburg am Inn - Master works BA 2 + BA3.
Architectural work BA 2 + BA3 - Total demolition approx. 3 000 m
- gutting building about 9 000 m
- Earthworks about 2 500 m
- In-situ concrete floor slabs approx. 1 600 m
- FT staircases 12 pieces,
- In-situ concrete ceilings approx. 500 m
- Ortbetonwände about 650 m
- Semi-finished TT ceiling approx. 1 550 m
- dismantling shoring approx. 130 m