the consultation concerns the low-current works, as part of the operation to extend the T6 line to the north between the East Hospitals and La Doua.The contract includes the following services:>The execution studies of the entire Low Current system (with the exception of the central systems),>the supply and installation of Low Current equipment (with the exception of central systems), >the performance of the Low Current tests>_Le contract execution period is 28 months (including the 2-month site preparation period) from the date fixed by the administrative order prescribing the start of the preparation period and the period of the execution studies
the consultation concerns the low-current works, as part of the operation to extend the T6 line to the north between the East Hospitals and La Doua.The contract includes the following services:>The execution studies of the entire Low Current system (with the exception of the central systems),>the supply and installation of Low Current equipment (with the exception of central systems), >the performance of the Low Current tests>_Le contract execution period is 28 months (including the 2-month site preparation period) from the date fixed by the administrative order prescribing the start of the preparation period and the period of the execution studies