The Framework Agreements for Subsequent Contracts include, but are not limited to: electrical and automation studies, procurement, manufacturing, cable pulling, electrical connections, commissioning of electrical equipment and training
• (*) Electrical and automation studies with technical documentation
• (*) PCH PLC programming (optional)
• Supply and manufacture of electrical distribution and automation equipment (HVA substations, LV switchboards, automation cabinets, cables, etc.)
• Cable pulling
• training
• (*) On-site assembly and electrical connections of equipment.
• (*) Commissioning tests
The missions identified with an asterisk must be considered essential missions and as such they cannot be subcontracted by the candidate.