Restaushub: approx. 2.010 m3
Surface area fine grade approx. 2,970 m2
Water drainage: Takeover of the earthworks plant, continued operation for approx. 100 days
In-situ concrete components / RC concrete: approx. 5,220 m3
Precast walls: approx. 4,760 m2
Semi-prefabricated ceilings: approx. 325 m2
Semi-finished walls: approx. 2,064 m2
Prestressed concrete girders with a length of approx. 12.8m each: 5 pieces above the gymnasium
Hollow core ceiling: approx. 370m2
Prefabricated staircases: 10 pieces
Reinforcing steel: approx. 1,362 tons.
KS-Mauerwerk: ca. 356 m2
Bitum. Waterproofing of roof surfaces below ground: approx. 80 m2
Bitum. Waterproofing of external wall surfaces below ground: approx. 930 m2
Perimeter insulation under floor slabs and on walls: approx. 3,080 m2
Workshop planning for finished parts, semi-finished parts.
Parts of Elt. installation work, underground pipes in the building as well as outside the building,
Restaushub: approx. 2.010 m3
Surface area fine grade approx. 2,970 m2
Water drainage: Takeover of the earthworks plant, continued operation for approx. 100 days
In-situ concrete components / RC concrete: approx. 5,220 m3
Precast walls: approx. 4,760 m2
Semi-prefabricated ceilings: approx. 325 m2
Semi-finished walls: approx. 2,064 m2
Prestressed concrete girders with a length of approx. 12.8m each: 5 pieces above the gymnasium
Hollow core ceiling: approx. 370m2
Prefabricated staircases: 10 pieces
Reinforcing steel: approx. 1,362 tons.
KS-Mauerwerk: ca. 356 m2
Bitum. Waterproofing of roof surfaces below ground: approx. 80 m2
Bitum. Waterproofing of external wall surfaces below ground: approx. 930 m2
Perimeter insulation under floor slabs and on walls: approx. 3,080 m2
Workshop planning for finished parts, semi-finished parts.
Parts of Elt. installation work, underground pipes in the building as well as outside the building,