In the years 2022 to 2024, Wohnungswirtschaft Frankfurt (Oder) GmbH will comprehensively renovate the residential complex Juri-Gagarin-Ring 1 - 41. The area Juri-Gagarin-Ring 1 - 41 was built in 1970 using the industrial construction method (IW 66/P2-5 storey). All seven residential buildings have a basement, 5 upper floors and a mezzanine. In each staircase there are 10 apartments (two-in-hand). A total of 359 apartments are to be renovated over the three construction phases.
The services of the 3rd construction phase include the buildings Yuri Gagarin Ring 1 - 4; 5 - 9 and 10 - 14 with a total of 129 apartments after renovation.
The renovation work will be advertised in 23 lots:
Lot 301 Baustraße
Lot 303 Crane operated dismantling
Lot 304 Demolition and gutting
Lot 305 Scaffolding
Lot 306 Shell construction and plastering work
Lot 307 Civil engineering work and outdoor facilities
Lot 308 EIFS and façade
Lot 309 Roofers
Lot 310 plastic windows
Lot 311 aluminum elements
Lot 312 Balconies/entrance stems
Lot 313 Basement ceiling and dremple insulation
Lot 314 Interior, functional and cellar doors
Lot 315 Drywall works
Lot 316 screed work
Lot 317 Painting works
Lot 318 Flooring work
Lot 319 tiling work
Lot 320 final cleaning
The 321 Balkonsanierung
Los 401 HLS
Lot 402 Electrical Work
Lot 403 Elevator systems
This tender covers only Lot 308 External thermal insulation composite system!
During the entire construction period, the apartments of the staircases J.-Gagarin-Ring 6 - 14 are mostly inhabited!
The staircase J.-Gagarin-Ring 5 and the building J.-Gagarin-Ring 1 - 4 are uninhabited.
EIFS and façadeJG01-04
- 1.700 m² MW-WDVS
- 55 m² Spritzwasserausbildung, XPS
- 195 m² Sockelausbildung, XPS
- 220 m aufgedoppelte Fensterrahmungen
- 170 m window sills
- 21 nesting and bat boxes
- 32 Entlüftungsöffnungen
JG05
- 625 m² MW-WDVS
- 20 m² Spritzwasserausbildung, XPS
- 50 m² Sockelausbildung, XPS
- 100 m aufgedoppelte Fensterrahmungen
- 55 m window sills
- 13 nesting and bat boxes
- 8 Entlüftungsöffnungen
JG06-09
- 1.360 m² MW-WDVS
- 55 m² Spritzwasserausbildung, XPS
- 160 m² Sockelausbildung, XPS
- 220 m aufgedoppelte Fensterrahmungen
- 170 m window sills
- 21 nesting and bat boxes
- 32 Entlüftungsöffnungen
JG10-14
- 1.900 m² MW-WDVS
- 65 m² splash training, XPS
- 225 m² base formation, XPS
- 275 m doubled window framing
- 210 m window sills
- 25 nesting and bat boxes
- 40 Entlüftungsöffnungen