Alleestraße; Redesign from Westring to Bessemer Strasse
- Road construction, asphalt and sewer construction works, marking and
Beschilderungsarbeiten, Leerrohrverlegungsarbeiten -
The following construction works will be carried out and the
Construction supervision is carried out depending on the respective
Ausschreibungsteile:
Part 1: Traffic Management
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 2: Sewer construction work combined sewer and trench system
Construction supervision: City of Bochum -Civil Engineering Office- Sewer Construction Department
Part 3: Road works
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 4: Cable and conduit laying work Traffic light systems
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 5: Marking work
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 6: Signage work
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 7: Groundwater monitoring point
Construction supervision: City of Bochum -Civil Engineering Office- Dept. of Roads
Part 8: Cable and conduit laying work for municipal utilities
Construction supervision: Stadtwerke Bochum
Part 9: Cable and conduit laying work Telekom
Construction supervision: Telekom
Alleestraße; Westring to Bessemer Straße
Compilation of the masses:
- accommodate approx. 14,900 m² of bituminous road pavement and
To dispose
-ca. Pick up and dispose of 8,000 m² of pavement pavement
-ca. Pick up and dispose of 1,500 m of edge edging
- Pick up and dispose of approx. 10,600 m³ of soil/backfills
- Construct approx. 11,400 m² of roadway, load class 10
-ca. 7,100 m² of pavement
-ca. 3,000 m of edging
-ca. Deliver and install 6 pcs of passenger shelters
-ca. 3,400 m³ of excavated soil for sewers and house connection lines
-ca. supply 120 m of concrete pipes DN 300 in cut-and-cover construction and
embarrassed
-ca. 665 m of concrete pipes DN 400 in cut-and-cover construction and
embarrassed
-ca. 47 pcs of precast reinforced concrete shafts supply and installation
-ca. 7,000 m³ of excavated soil for tree trenches and
Kunststoffrigolen-System
-ca. Deliver and install 34 pcs D-Rainclean Box 60/60/60
-ca. 33 pcs PVC-U DN 1000 throttle shafts supply and set
-ca. Constructing 900 m drainage pipe from HS partial drainage pipes
-ca. 450 m sewer made of HV pipes
-ca. 1,320 units of D-Raintanks 3000 (Rigole 60/60/60) and
Install
-ca. 60 m pipe relining DN 300
-ca. 3,700 m of road markings
-ca. 140 pcs directional arrows, pictograms or letters
mark
-ca. 60 Pcs Traffic Sign Post Supply And Place
-ca. 110 St Traffic Signs Supply & Install
- Dismantle 1 groundwater measuring point and relocate it to another
Rebuild a position
-ca. 3,800 m of securing cables, pipelines and the like
-ca. Laying 6,750 m of plastic pipe > 110 to 125 mm diameter