263 Hospital Freyung BA 5 - reconstruction endoscopy / laboratory.
- about 520 m 2 Occupation of wall slabs with glass fiber fabric, finely structured,
- About 100 m 2 Occupation of wall slabs with glass fiber fabric, roughly structured according to stock,
- about 570 m 2 Wall painting 2-times with Agrylatfarbe,
- about 140 m 2 Wall painting 2 times with latex 2K paint for laboratory (protection level 2),
- about 350 m 2 Ceiling painting 2 times with Agrylatfarbe,
- About 100 m 2 Covering with latex 2K paint for laboratory (protection level 2),
- approx. 12 pieces of opaque paint for primed enclosing frames for hinged and sliding doors,
- Approx. 8 hours of covering varnish for existing radiators.