Procurement of a boiler system in a building still to be built for inclusion at the Saarlouis site on the Dillinger Hütte site to implement the construction project. The scope of delivery and services can be found in the tender documents.
Planning, design, construction, manufacture, delivery, installation and installation, operational assembly, commissioning, trial operation, participation in the takeover and acceptance of a boiler system consisting of
2 hot water boilers in single-flame tube technology, each with at least 20 MWth heat output, with associated exhaust gas heat exchanger (Eco), silencer, exhaust pipe and chimney