22E0232 (NL Mainz), University of Applied Sciences WO Main Campus, Replacement New Building Building G, Earthworks, Walls and Concrete Works
50 weeks set up and operate the construction crane, manufacture the crane foundation, subsoil construction consisting of a bored girder paving in bored pile quality with a wood infill, work din 18300, fill the excavation pit with broken, angular natural gravel, dissolve the ground Abu pit, load transp., protection of root area, enclosure trunk, 20 PCS plate pressure tests, sewer work DIN 18306, sewer pp, double shaft concrete/reinforced concrete precast elements, grease separator, pump shaft, Amuerarbeiten DIN 18330, MAuerwerkinnenwand D17,5, D24 Betonarbeiten DIN 18331, Gebäudekonstruktion,Oberflächengüte Sichtbeton SB 1+3, Formwork, In-situ concrete Foundation support reinforced, Perimeter insulation, In-situ concrete for interior walls,Ceiling tiles, Foundations, Stairs and platforms, Staircase running Precast part, Console Precast part, Steel Reinforcing bars, Reinforcing bar steel, Reinforcing bar steel mats