L597 Ma-Friedrichsfeld - Ladenburg, node L597 / L637, construction phase 2, BW 2 + 3.
Construction and insertion of 2 frame structures made of reinforced concrete.
Raising the OEG track system to a length of 200 m.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.