Construction of two elevators with 4 stops each.
Passenger lift, rope hoist without engine room with shortened crossing.
Construction period 07.2023 to 10.2025
Construction in 2 construction phases, one elevator system per construction phase.
Construction of two elevators with 4 stops each.
Passenger lift, rope hoist without engine room with shortened crossing.
Construction period 07.2023 to 10.2025
Construction in 2 construction phases, one elevator system per construction phase.
Components:
- 2 pcs. passenger elevator, 8 pers. 630 kg
- Rope hoist without engine room
-Disabled
- 4 stops
- Enev kit