Delivery and installation of a complex heating system plus maintenance
Delivery and installation of a complex heating system consisting of a new district heating connection to be built 500 kW (primarily Enercity, secondary contractor), with 7 secondary heating circuits with a network of threaded pipes, radiators/
Radiant ceiling panels, connections to WT for air conditioning systems and drinking water preparation in a new building, consisting of building part D (school with rowing room) and component F (sports hall). Partial installations are carried out in a cramped crawl space, complying with the requirements of the
occupational health and safety on the part of the Contractor. Compact units are provided for refrigeration systems.