See II.2.4
Preparatory work
- the selective demolition of concrete structures;
Draining work
- excavations necessary for the laying of pipes and inspection chambers;
- the installation of concrete slugs;
- the creation of a visitation room and an aqueduct head.
The work is carried out on the III network: rue Guillaume d'Orange.