Pipeline construction, shaft structures, well structures incl. installation
Pipeline construction:
- ca. 2000 m, DN 200 GGG, MDP 16
- ca. 1000 m, DN 200 GGG, MDP 16
- approx. 1000 m, AD 50 PE-HD, 3-fold pipe
- approx. 800 m, AD 50 PE-HD, 2-fold pipe
- ca. 200 m, AD 110 PE-HD
Shaft and well structures:
- New construction well 7514B incl. installation
- New construction of the E0 vent shaft incl. installation
- New construction of the Sachsenflur AGS delivery shaft incl. installation