Gardening and landscaping for the outdoor area of the tropical hall incl. water surfaces, enclosure sprinklings, wooden stables, artificial rock work, pathways, reinforced concrete work.
Part of this tender are all landscape gardening work outside the hall. These include the construction of paths, access roads, paving of the economic areas, creation of the main visitor path and side paths, plant delivery and planting, lawn sowing, the construction of railings, knee spars and gates as well as the creation of outdoor enclosures for tapir, ring-tailed mongooses and manchurian cranes.
approx. 145 m² designed concrete approx. 1,050 m² water-bound pavement approx. 1,375 m² paving areas approx. 25 m² WPC planks approx. 54 lfm board fence 4 pcs gates approx. 35 lfm railing approx. 60 lfm drainage channels approx. 3,650 m² sowing areas approx. 1,050 m² planting areas 29 pcs. tree planting 1 pcs. shelter 2 pcs. concrete water basin The visitor path to the entrance of the hall and the exit area are made of designed concrete without edge border, the continuation of the visitor path to the shop takes place in water-bound path ceiling, also without edge border. The path climbs sharply. For better water drainage, paved transverse channels are created. The designed concrete and the water-bound pavement are designed for passability with care vehicles. Side paths are only accessible. The north and south economic areas and their access roads will be paved with concrete pavement.
The railings are made of a wood construction with mesh cover. The doors and gates are also made of wood, partly on a steel substructure.
The floor covering in the animal enclosures consists of topsoil and mulch areas, smaller sandy areas and individual planting islands. Lawn is sown in the tapir enclosure.
The enclosures of the Manchurian cranes and ring-tailed mongooses receive small water basins with drains. The delivery of the processes is carried out on site, the installation must be carried out by the gala builder. The walls in the hall wall are lined with illusion painting and artificial rocks in the animal areas. A lifelike replica of plfanzen and rocks is to be produced.
The stable of the crane is to be produced as a wooden frame construction and has a rustic façade attached to the lattice walls.
During the execution, several trades are working in parallel on the construction site, such as.B. shell construction, rock designers, electrical and water technology. The resulting difficulties must be taken into account.
The construction site is very cramped. Debris, excavated material, material residues must always be removed immediately. There are no major storage facilities. Larger material deliveries must be agreed in advance with the BÜ. The construction site equipment must be limited to the bare essentials.