Administration building Hüttenstraße 14 Modernization and roof extension — Lot 312 plastering works.
1st construction phase:
— protective measures for floors, doors and windows,
— 25 m
— plastering 300 m of cable slots
— 40 m to clean doors and windows.
2nd construction phase:
— protective measures for floors, doors and windows,
— 155 m
— clean 500 m cable slots
— 100 m to clean doors and windows.
3. Construction phase:
— protective measures for floors, doors and windows,
— 210 m
— clean 800 m cable slots,
— 350 m to clean doors and windows.
4. Construction phase:
— protective measures for floors, doors and windows,
— 300 m
— plastering 300 m of cable slots
— 350 m to clean doors and windows.