— demolition work: 700 m
— installed: 875 m
— composite steel bridge: 620 t steel; 2,300 m
— adaptation of traffic area: 2,500 m
— catenary system construction.
3.12.2021 to 13.3.2024
The work must be completed within 118 weeks of the start of execution.
Single period: Cancelation prev. Bridge and installation auxiliary bridge — period: 13.5.2022-27.5.2022.