The water association Peine, hereinafter referred to as the working group, intends to put out the cleaning and visual inspection of sewer networks in the villages of Bodenstedt, Vallstedt, Solschen and Alvesse.
Cleaning and visual inspection of the Solschen sewer networkThe following cable lengths are available: SW pipes 120 m, RW pipes 455 m, MW pipes 9,675 m, SW shafts 10 pcs, RW shafts 20 st, MW shafts 300 h, SW lines 100 m, RW lines 2,100 m, MW lines 7,400 m, SW house connection control shafts 10 pcs, RW house connection control shafts 10 pcs House inspection shafts 250 St
Cleaning and visual inspection of sewer network AlevesseThe following cable lengths are available: SW pipes 2,115 m, GW pipes 2,260 m, SW shafts 70 pcs, RW shafts 65 pcs, SW lines 1,450 m, RW lines 1,230 m, SW house connection control shafts 80 h, RW house connection control shafts 45 h
Cleaning and visual inspection of sewer network BodenstedtThe following cable lengths are available: SW pipes 3,960 m, RW pipes 5,560 m, SW shafts 110 pcs, RW shafts 175 h, SW lines 3,540 m, RW lines 3,000 m, SW house connection control shafts 190 h, RW house connection control shafts 120 h
Cleaning and visual inspection of sewer network VallstedtThe following cable lengths are available: SW pipes 9,510 m, RW pipes 8,710 m, SW shafts 185 pcs, RW shafts 250 st, SW lines 5,600 m, RW lines 5,500 m, SW house connection control shafts 350, RW house connection control shafts 140 h