Heating, ventilation and air-conditioning installation work | Tenderlake

Heating, ventilation and air-conditioning installation work

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
11 March 2020
Closing Date:
16 April 2020
Location(s):
DEF0D Segeberg (DE Germany/DEUTSCHLAND)
Description:
Construction of a new laboratory building, Leibniz respirator, ventilation technology 32000081OV

- 1 supply / extract air unit (partial air conditioning), air volume approx. 18,000 m³ / h;

- 1 supply / extract air unit (partial air conditioning), air volume approx. 40,000 m³ / h;

- 2 units of supply / exhaust air units (air conditioning), air volume approx. 12,000 m³ / h each;

- 2 units of supply / exhaust air units (air conditioning), air volume approx. 15,000 m³ / h each;

- 2 pieces of supply / exhaust air devices (air conditioning) S3 areas, air volume approx. 20,000 m³ / h each;

- 20 special exhaust systems for digestories, 24h exhaust air each approx. 100-4,000 m³ / h;

- approx. 200 fire dampers;

- approx. 500 volume flow controllers;

- approx. 10,000 m 2nd Duct (galvanized sheet steel, PPs and stainless steel);

- approx. 3,000 m round pipeline (galvanized sheet steel, PPs and stainless steel);

- approx. 350 grids / swirl outlets;

- approx. 100 poppet valves.

See II.1.4).

Download full details as .pdf
The Buyer:
Neubau eines Laborgebäudes, Leibniz-Respiratorium
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work
45331220 - Air-conditioning installation work