Collective sanitation service works in the Bouchet valley.
O des Aravis commissioned the Montmasson firm to supervise this work in the town of Grand-Bornand (74). These fall within the framework of the actions planned by the Master Plan for the small water cycle (SDCE - adopted at the end of 2019), as well as, more broadly, within the framework of the objectives of the Sage de l'Arve.
The works will consist of the creation of a main wastewater treatment collector, with its antennas, and also the creation of private connections with their boxes, as well as the laying of a DWS pipes in common trenches on part of the route. .
The total length of the route represents a linear 10 km network.
This work, divided into three geographical lots contiguous with respect to the main collector, includes:
- lot 1: from node 1 to node 85,
- lot 2: from node 85 to node 135,
- lot 3: from node 135 to node 236.
Section 1: nodes 1 to 85Section 1: nodes 1 to 85.
Section 2: node 85 to 135Section 2: node 85 to 135.
Section 3: node 135 to 236Section 3: node 135 to 236.