Overall dimensions:New construction (new building component I) and restructuring (new building/demolition) Part II and Part III)
of the former comprehensive school Senefelder-Schule Treuchtlingen in several construction phases during ongoing school operations.
As part of the restructuring, the three school types of middle school, junior high school and high school will be combined in one building under the roof of the integrated and differentiated comprehensive school and equipped with flexible rooms and learning areas.
Because the dimensions. Several construction phases are planned to take place during ongoing school operations:
- Preliminary run: partial cancel Existing building "Mensa" for new building measure BT I;
- 1st construction phase: three-storey new building BT I school specialist classes on the eastern property:
- 2nd construction phase: Abbr. Existing specialist classes;
- new building of sports hall BT II;
- 3rd construction phase: Abbr. Existing sports hall;
- new three-storey school BT III:
Classes / administration of the teachers' room - follow-up: demolition of existing classroom wing and lunchtime supervision
Manufacture of outdoor facilities
Roof area with approx. 3000m2 as a flat roof with vapour barrier, EPS & mineral fibre insulation thickness average 280mm and
FPO roof waterproofing. Gravelled area of approx. 3000m2
450m parapet cover and circumferential side protection railing
1x RWA Dunkelklappe