The housing industry Frankfurt (Oder) GmbH will comprehensively renovate the residential complex Juri-Gagarin-Ring 1 - 41 between 2022 and 2024. The area Juri-Gagarin-Ring 1 - 41 was built in 1970 in industrial construction (IW 66/P2-5 storey). All seven residential buildings have a basement, 5 upper floors and a Drempelgeschoss. In each staircase there are 10 apartments (two-horse). A total of 359 apartments are to be renovated over the 3rd construction phases.
The services of the 3rd phase of construction include the buildings Yuri Gagarin Ring 1 - 4, 5 - 9 and 10 - 14 with a total of 129 apartments after renovation.
The renovation work will be advertised in 23 lots:
Lot 301 Baustraße
Lot 302 Construction site installation
Lot 303 Crane operated dismantling
Lot 304 Demolition and gutting
Lot 305 Scaffolding
Lot 306 Shell construction and plastering work
Lot 307 Civil engineering work and outdoor facilities
Lot 308 EIFS and façade
Lot 309 Roofers
Lot 310 plastic windows
Lot 311 aluminum elements
Lot 312 Balconies/entrance stems
Lot 313 Basement ceiling and dremple insulation
Lot 314 Interior, functional and cellar doors
Lot 315 Drywall works
Lot 316 screed work
Lot 317 Painting works
Lot 318 Flooring work
Lot 319 tiling work
Lot 320 final cleaning
The 321 Balkonsanierung
Los 401 HLS
Lot 402 Electrical Work
Lot 403 Elevator systems
During the entire construction period, the apartments of the staircases J.-Gagarin-Ring 6 - 14 are mostly inhabited!
The staircase J.-Gagarin-Ring 5 and the building J.-Gagarin-Ring 1 - 4 are uninhabited, as floor plan changes are taking place here.
This tender covers only lot 312 balconies/porches for the second 3rd BA J.-Gagarin-Ring 1 - 4, 5 - 9 and 10 - 14.
Balconies/entrance porchesJG01-04
- 4 balcony double stands consisting of water-impermeable prefabricated reinforced concrete elements with attached aluminium railings, balcony drainage and connection to the existing building including foundation work in barrier-free design
- 2 entrance porches consisting of precast reinforced concrete elements with increte installation, roof construction and waterproofing, roof drainage and connection to the existing building including foundation work
- Workshop planning/control measurement
JG05
- 1 balcony system consisting of waterproof precast reinforced concrete elements with attached aluminium railing, balcony drainage, roof waterproofing and connection to the existing building including foundation work in barrier-free design
- 10 new continuous parapets on the previous one Balcony systems including balcony drainage and connection to the existing building in barrier-free design
- 2 entrance porches consisting of precast reinforced concrete elements with increte installation, roof construction and waterproofing, roof drainage and connection to the existing building including foundation work
- Workshop planning/control measurement
JG06-09
- 40 new continuous parapets on the previous one Balcony systems including balcony drainage and connection to the existing building in barrier-free design
- 4 entrance porches consisting of precast reinforced concrete elements with increte installation, roof construction and waterproofing, roof drainage and connection to the existing building including foundation work
- Workshop planning/control measurement
JG10-14
- 50 new continuous parapets on the previous site Balcony systems including balcony drainage and connection to the existing building in barrier-free design
- 5 entrance stems consisting of precast reinforced concrete elements with in-concrete installation, roof construction and waterproofing, roof drainage and connection to existing including foundation work
- Workshop planning/control measurement