works contract comprising 4 lots፦ photovoltaic electricity- waterproofing roofing- metal frame- foundations
photovoltaic electricitymain lot consisting of the realization of photovoltaic plants on 3 existing buildings as well as a shade. The 4 plants hold a CRE call for tenders and must be put into operation by September 2022. Installed power = 1.3 Mwc
Waterproofing coverlot intended for the preparation of 2 roofs before installation of photovoltaic panels. Tearing off the isoimpermeable complex on a building to install new insulation and waterproofing + poles. Removing asbestos fibro-cement sheets for the other building and installing a new insulation+sheet metal. Total surface area to be treated of 6,000 m2
Metal framerealization of the metal frame for two shade shades with a total area of 900 m2
Foundationsrealization of foundations for a photovoltaic shade of 900m2