Construction of 4 6-storey residential buildings with 10 apartments each with a total living area of approx. 3 400 m
Gross amounts:
- go own construction site equipment:
- BE for own construction services, incl. TDK,
- Approx. 700 m
- Approx. 800 m
- earthworks:
- Approx. 1 250 m
- Analysis according to LAGA by AG,
- Approx. Transport and dispose of 2 900 t of construction pit excavation,
- of which approx. 1200 t disposal allocation class up to Z2,
- of which approx. 200 t disposal allocation class> Z2,
- Approx. 650 m
- Approx. 570 m
- drainage channel works:
- Approx. 250 m excavation in and outside the building, depth up to 80 cm,
- Approx. 50 m
- Approx. 250 m laying of new underground pipes PP pipe up to DN 150, outside and in the building,
- Approx. Install 30 pieces of built-in elements in floor panels.
- reinforced concrete works foundation:
- Approx. 135 m
- Approx. 270 m
- Approx. 400 m
- Approx. Deliver and install 70 t of reinforcing steel for foundations.
- reinforced concrete works
- Approx. 300 m
- Approx. 2400 m
- Approx. Deliver and install 45 t of reinforcing steel for walls,
- Approx. 100 m
- Approx. 300 m
- Approx. 2000 m
- Approx. 380 m
- Approx. Supply and install 100 t of reinforcing steel for monolithic and semi-finished slabs,
- Supply and install various punching shear reinforcement.
- reinforced concrete prefabricated parts:
- manufacture, deliver and assemble 20 pieces of prefabricated staircases with 2 podiums,
- manufacture, deliver and assemble 16 pieces of balcony sheets up to approx. 2.20 x 3.40 m,
- manufacture, deliver and assemble 2 piece angle elements as a wall-mounted roof element.
- masonry work:
- Approx. 1700 m
- Sealing and insulation work:
- Approx. 220 m