Stadibau GmbH plans to clear the construction site, including the underground demolition of existing structures, and to rebuild a residential building on the property at Linprunstraße 19 in Munich. The construction of Linprunstraße 19 takes place in the first construction phase, followed by the new construction of Linprunstraße 13.
- Earthworks, remaining excavation: approx. 547 m
- Backfilling: approx. 516 m
- Gravel on the underground garage ceiling: approx. 295 m
- Outer masonry 42.5 cm: approx. 157 m
- External masonry, load-bearing, 24 cm: approx. 490 m
- Roller shutter boxes (without curtains): approx. 68 pieces
- Interior masonry, 11.5 cm to 24 cm: approx. 1,050 m
- Steel zone foundations, floor slabs: approx. 278 m
- Reinforced concrete outer walls: approx. 201 m
- Reinforced concrete inner walls: approx. 126 m
- Reinforced concrete columns: approx. 11 m
- Solid reinforced concrete ceilings: approx. 256 m
- Precast staircases: 19 pieces,
- Precast loggias: 12 pieces,
- Semi-prefabricated slabs, 22 cm: approx. 1 580 m
- Semi-prefabricated walls, 25-35 cm: 153 cm,
- Reinforcing steel: approx. 173 to.,
- Joint plates (WU area): approx. 154 m,
- Coating of the underground car park ramp (as sealing and driving surface): approx. 66 m
- Sealing of underground car park foundations: approx. 320 m
- Ceiling soffit insulation, multilayer panels: approx. 315 m
- Bituminous sealing of the underground garage ceiling: approx. 444 m
- Basement window, plastic: 3 pieces as well as basic lines and electrical inlay.