1 psch.Sigeko, approx. 2300 m ordnance sounding, approx. 8500 m² of space clearing, approx. 190 pcs. Grub rootstocks, remove and recycle approx. 1500 m³ above ground, loosen approx. 3050 m³ soil/rock and reuse or recycle approx. 470m drainage pipes, cancel approx. 12 seepage shafts, supply approx. 3000 m³ building materials, produce approx. 9645 m³ pipe trench, supply and install approx. 340 m GFK_pipes DN 2400, approx. DN 500 deliver and insert, ca. 6 pcs. Precast concrete shafts DN 1500 or DN 1000, approx. 3 pcs. Tangential shafts for DN 2400 pipeline, produce approx. 545 m² bored pile walls, install approx. 100 t of reinforcing steel, install approx. 725 m of grouting anchor. , ca. 105 m² concrete for subfloor,, approx. 38 m³ undeveloped Insert concrete, install approx. 240 m³ of reinforced concrete, insert approx. 390m² beam wall, install approx. 80 m of steel railings. “Company building” install approx. 40 m² vapor barrier,, install approx. 40 m² vapour barrier, produce approx. 85 m² masonry, 1 piece roof truss manufacture, 1 piece facade insulation, 1 pc interior plaster
The subject of this tender is the partial construction of a
Drainage device “storage channel and pumping station