The object of the order is the maintenance of reservoirs on the premises of the Catchment Board in Krosno — stage 1, broken down into 4 parts:
1) Part 1 of the order: maintenance of the reservoir Scar in the m. Jasienica Rosielna;
2) Part 2 of the order: maintenance of the reservoir Nowa Wieś;
3) Part 3 of the order: maintenance of dry flood control reservoir — polder Flora in m-ci Klimkówka, gm. Rymanów;
4) Part 4 of the order: the performance of permanent surveillance and operation of water facilities and facilities on the premises of NW Łańcut.
Maintenance of the Scar tank in the Scar gm. Jasienica RosielnaThe subject of this order is, among others, the performance of a service consisting of maintenance of the current water reservoir, band ditches, forest ditch in km 0+000—0+171, Drożdżalowski stream in km 3+137—3+535, cleaning filters on bottom shots in order to maintain the correct position of the mirror water in the reservoir and proper operation of water supply equipment and surveying warp measurements for displacement observation.
Maintenance of the reservoir Nowa VillageThe subject of this order is to perform a service consisting of mowing down the scarps of the reservoir dikes and vegetation from the surface of the mirror of the root water in the bottom and the felling of the bushes together with baring and exporting.
Maintenance of dry flood control tank — Flora polder in m-ci Klimkówka, gm. RymanówThe subject of this order shall be the execution of works consisting of the maintenance of the current dry reservoir p flood polder “Flora”.
The scope of works includes:
Stage I:
— mowing the crown of the reservoir frontal dam. If mown grass is shredded into a fraction of not more than 10 cm, it will not be necessary to grind it, in the absence of the possibility of fragmentation, it is necessary to grind it,
— mowing down the slopes of the Morwawa Creek and the Flora Trench,
— grinding the mown grass and folding at the upper edge of the slopes of the Morwawa Creek and the Flora Trench,
— clearing the inlets and drains from bottom discharges with landscaping.
Stage II:
— mowing the crown of the reservoir frontal dam. If mown grass is shredded into a fraction of not more than 10 cm, it will not be necessary to grind it, in the absence of the possibility of fragmentation, it is necessary to grind it,
— mowing the escarpments of the Morwawa Creek and the Flora ditch in the area of bottom discharges,
— grinding the mown grass and folding at the upper edge of the slopes of the Morwawa Creek and the Flora Trench,
— earthworks along the shore of the Morwawa stream with the transport of the charm to the indicated location
— cleaning the inlets and drains from the bottom discharges with the development of the outlet,
— cleaning from rust and old paint elements of the metal structure of protective barriers on the inlets and outlets of the mucus — 4 pcs of protective barriers and 2 grounded, cavities of caidators for shanders from the side of the water inlet to the sweat muces. Flora and sweat. Mulberry and lattice of steel ribbed rods in diameter Ø14 mm on the above mucus inlets,
— painting with primer paint, priming elements of the metal structure of protective barriers on the inlets and outlets of mucus 4 pcs of protective barriers and 2 grounded, cavities of cauldrons on boards from the side of the water inlet to the mucous to sweat. Flora and sweat. Mulberry and lattice of steel ribbed rods in diameter Ø14 mm on the above mucus inlets,
— painting with surface paint, oil elements of the metal structure of protective barriers on the inlets and outlets of mucus 4 pcs of protective barriers and 2 grounded, cavities made of coils for banners from the side of the water inlet to the sweat mucus. Flora and sweat. Mulberry and lattice of steel ribbed rods in diameter Ø14 mm on the above mucus inlets,
— purchase and installation of gilded steps, cast iron on the side walls of the outlets from slime to sweat. Flora and sweat. Moravia,
— concreting the grounded post on the crown of the earth dam of the Flora polder — grounded on the side of the Flora ditch,
— repair of the closure of the grounded on the crown of the dam of the Flora polder grounded from the Flora ditch,
— sown with a mixture of grasses.
Stage III:
— mowing the crown of the reservoir frontal dam. If mown grass is shredded into a fraction of not more than 10 cm, it will not be necessary to grind it, in the absence of the possibility of fragmentation, it is necessary to grind it,
— clearing the inlets and drains from bottom discharges with landscaping.
Permanent supervision and operation of water facilities and facilities on the premises of NW ŁańcutThe subject of this order shall be the execution of construction works and services consisting of the mowing and grinding of reservoirs, the cutting of branches and rubbish exportation and the cleansing of piling structures from imaging.