structural work
The structural work includes:
- approx. 3400 m3 excavation pit/foundation excavation
- ca. 1400 m2 Fundamentschalung
- ca. 240 m3 Fundament-Beton
- approx. 2600 m2 reinforced concrete floor slabs
- ca. 1800 m2 Wandschalung
- ca. 80 m2 Deckenschalung
- approx. 280 m3 in-situ concrete (walls)
- approx. 22 m3 in-situ concrete (ceilings)
- approx. 115 t reinforcing steel
- approx. 785 m2 masonry (hollow blocks)
- approx. 185 m2 masonry (flat vertical perforated brick)