Lot 104 Structural work - Old building
Coarse quantities
40 m3 - Bricking, window and door openings in existing buildings
400 m - Lining of ventilation shafts in existing buildings
1,000 pieces - brick lining openings, niches, slots of the TGA
30 pieces - Manufacture window and door openings in existing walls
140 pieces - Manufacture wall and ceiling openings for TGA
140 m² - Demolition of vaulted ceilings
3,000 m² - Demolition of wooden beam ceilings
3,100 m² - New construction of brick suspended ceilings with concrete
90 m² - New construction of reinforced concrete floor slabs inside buildings
110 m² - New construction of reinforced concrete walls inside buildings
44 pieces - Demolition of basement windows and doors
45 pieces - New construction of water-impermeable basement window frames
45 pieces - New construction of waterproof basement windows
400 pieces - core drilling in walls and ceilings
1,800 m3 - Demolition of complete buildings (extensions)
60 m3 - Demolition of masonry walls, shafts, masonry
850 m² - Demolition of floor structures over vaulted ceilings
1 piece - Lifting station incl. ground line connections