Ehem. Officer's settlement — Conversion of military living into residential use in Buchenstraße, Bamberg — Tiling and panel work of construction phase 3.
The building site with the buildings to be renovated is located along Buchenstrasse and has so far been used for military housing.
There are 15 semi-detached houses (= 30 semi-detached houses) and one single-family house along Buchenstrasse, which are now to be renovated. In this construction phase, 10 semi-detached houses are being worked on.
The overall measure extends from 2019 to probably 2022, is divided into several construction phases and is funded by the government of Upper Franconia and the Free State of Bavaria as part of the urban development subsidy and the municipal housing subsidy program (KommWFP).
Section 3:
This section includes the semi-detached houses Hs.No. 27-29, 22-24, 23-25, 18-20, 19-21
Product:
Tiling and paving, DIN 18352 — Construction phase 3
Type and scope of the service:
Preparatory work and tile work on walls and floors
- approx. 280 m
— approx. 280 m plinth tiles,
- approx. 300 m