extension (extension and increase approx. 13200 m³ BRI) and general renovation (approx. 33600 m³ BRI) of the state secondary school Schesslitz;
Trade-based allocation according to experts
Trade/LV 5/201: Shell construction work BA 5, general renovation
Trade/LV 5/202: Scaffolding work BA 5, general renovation
Trade/LV 5/203: Carpentry BA 5, general renovation
Trade/LV 5/204: Roof waterproofing work BA 5, general renovation
Trade/LV 5/205: Plumbing work BA 5, general renovation
Gewerk/LV 5/206: Installation of PCB rooms BA 5, general renovation
Trade/LV 5/201:
Designation: Shell construction work BA 5, general renovation
Quantity or extent of dismantling work:
Demolition equipment PCB rooms:
Fitted wardrobes approx. 270 m²
Experimentiertische ca. 100 m
Built-in digestorium approx. 1 piece
Kitchenettes 5 m long approx. 4 pieces
Acoustic suspended ceilings made of smooth edge boards incl. KMF approx. 1,200 m²
Acoustic suspended ceilings made of wood-based materials incl. KMF approx. 1,000 m²
Acoustic wall coverings made of wood / wood-based materials approx. 280 m²
Gipskartontrennwände / Vorsatzschalen ca. 180 m²
Demolish KS exposed masonry approx. 190 m²
Demolition of surface coverings Lino / PVC / textile approx. 1,200 m²
Demolition of mastic asphalt floor structure with cork insulation approx. 300 m²
Quantity or extent of structural work:
Create new floor plate for outdoor equipment room approx. 70 m²
In-situ concrete foundations approx. 7.5 m³
In-situ concrete base plate approx. 12 m³
Formwork foundations approx. 10 m²
Reinforcement mesh / bar steel approx. 1.6 to.
Exposed masonry sand-lime brick format NF approx. 140 m²
Exposed masonry sand-lime brick special format 71 x 240 x 240 approx. 80 m²
Waterproofing work Base plate / base approx. 350 m²
Earthworks for drainage / plinth sealing approx. 200 m³
Drainage pipes up to DN 250 approx. 50 m
Druckleitung PE 100 40 x 3.7 ca. 20 m
Trade/LV 5/202:
Designation: Scaffolding work BA 5, general renovation
Quantity or scope:
Facade scaffolding W06 H1 LK 3 approx. 1,000 m²
Konsolausleger ca. 530 m
Room scaffolding in the interior to separate working area above / school traffic area below, dustproof approx. 350 m³
Trade/LV 5/203:
Designation: Zimmerarbeiten BA 5, general renovation
Quantity or scope:
Creation of a hipped roof, floor area approx. 28 x 44 m
Sawn timber NH-C24-S10-S up to length 15 m approx. 38 m³
Tiking Setting up squared timber approx. 2,800 m
Wooden formwork, undercover approx. 1,350 m²
Thermal insulation raw ceiling mineral wool approx. 1,300 m²
Trade/LV 5/204:
Designation: Roof waterproofing work BA 5, general renovation
Quantity or scope:
Demolition of flat roof structure approx. 1,700 m²
Vapour barrier/sealing V60 S4 + AL approx. 1,700 m²
Trade/LV 5/205:
Designation: Plumbing BA 5, general renovation
Quantity or scope:
Covering aluminium profile panels approx. 1,350 m²
Hängedachrinne ca. 150 m
Downpipes approx. 20 m
Fall protection cable system approx. 120 m
Skylight domes 1.50 x 1.50 m approx. 6 pieces
Trade/LV 5/206:
Designation: Furnishing PCB rooms BA 5, general renovation
Quantity or scope:
5 classrooms physics, chemistry, biology each with teacher's desk and 32 student seats, 4 device top cabinets, various accessories
4 preparation and collection rooms PCB with laboratory tables, equipment cabinets, refrigerators and hazardous material cabinets, various accessories