Hammer Gemeinnützige Baugesellschaft mbH (HGB) plans and realizes the new construction of three apartment buildings with 53 residential units as publicly funded housing construction. The three new buildings are built in solid construction as non-basement two-storey buildings with a relay level and flat roof. There is a technical room on the ground floor and an elevator is built on the stairwell. The subject of the services to be carried out in this business is room and wood construction work for the three buildings.
The construction works advertised are the room and wood construction work for the three residential buildings. According to the current schedule, the advertised work is expected to be carried out between the three houses at the following times:
House A: 28.03.2022 - 14.04.2022,
House B: 04.07.2022 - 29.07.2022 and
House C: 24.10.2022 - 11/18/2022.