OSI - Smart Safety Tools: SHuntage device, Handheld Stop Signal (SAM) day, night and Firecracker (remote control)
In the case of a procedure requesting track closure during railway works, additional safety measures are taken by the equipment in addition to those taken by traffic. These measures are accompanied by the installation of so-called "looping" tools on the construction area, the "OSI" Intelligent Safety Tools.
- Connected Shunting Bar
- Connected day and night Main Stop Signal (SAM)
-Firecracker