carpentry doors. Construction site equipment, 63 pcs. interior doors (some with fire and sound insulation requirements), 190 m2 wall cladding with wardrobes
In general. The building is in flood area. The drywall work is carried out partly in stock (approx. 2,000 m³) partly in the new building approx. (5,700 m³). The roof of the two-storey, semi-basement structure is designed as a board pile ceiling, while the non-basement, partly two-storey new building is partly designed as a hollow ceiling and partly as a flat ceiling. The outer walls are concreted and the inner walls made of HLZ brick-built. The foundation of the new building is largely carried out as a base plate in various thicknesses.
carpentry doors. Construction site equipment, 63 pcs. interior doors (some with fire and sound insulation requirements), 190 m2 wall cladding with wardrobes
Other CPV codes:
44221200
45432210
45422000