Implementation of the simulation developed in the STRADA project.
The services are to be prepared in accordance with subproject 3 “Information technology implementation” of the ERC project “Simulation of Transport between the Adriatic Sea and the Danube”.
- Building the basic model with a digital landscape model and weather data
- Land transport calculations
- Water traffic calculations
- Structure of the entire system
Work contract
independently and at your own risk
Implementation of the simulation developed in the STRADA project
The services are to be prepared in accordance with subproject 3 “Information technology implementation” of the ERC project “Simulation of Transport between the Adriatic Sea and the Danube”. They include
(1) until 12/2022: Building the basic model with digital landscape model and weather data
- System architecture
- Data model of simulation data
- Interface design
- Integration of the digital terrain model
- integration of weather data
- First pilot version
(2) to 12/2023: Land transport calculations
- Integration of reconstructed paths and infrastructure
- Integration of experimental data
- Implementation of model algorithms
- validation
- Expansion of the system
- Completion of the module/final tests
(3) to 12/2024: Water traffic calculations
- integration of reconstructed waterways
- Calculation of levels and flow conditions
- Integration of boat performance data
- Integration of the Open CPN simulation software
- validation
- Expansion of the system
- Completion of the module/final tests
(4) to 6/2025: Building the entire system
- Merging the individual modules
- Integration of all experimental and archaeological/historical data
- Final simulation calculations & validation
- documentation