The two listed buildings House 1 (built in 1906, GF 1,970 m²) and House 2 (built in 1909, GF 2,075 m²), which until recently were used continuously as ward blocks, will be converted into 132 apartments for nursing staff of Münchenstift GmbH and München Klinik gGmbH, including a daycare center, and a TG will also be built. The buildings have basement, ground floor, 3 floors and attic. In addition, there are 2 connecting corridors with basement, ground floor, 1 floor).
The subject of the contract is electrical installation work (low-voltage and low-voltage systems)
Supplement to II.1.4)
Low voltage switchgear
-2x Wandlermesschrank
-11x meter cabinet for a total of 132 meters
-1x Standverteiler für NSUV (576 FULL)
-132x small distributor for apartment distribution
-132x multimedia distributor for apartment distribution
-8x Installationsverteiler (60 PLE)
-4x Wandverteiler (336 FULL)
-5x Wandverteiler (420 FULL)
-1x Installationsverteiler (72 PLE)
low voltage installation systems
-54000m NHXMH-J lines
-17650m control lines
-8400x installation devices (switches, sockets, etc.)
-4825m cable routing (cable tray, installation duct, etc.)
-15000m electrical conduit (flush-mounted, concrete, cavity wall laying)
-2000x Kabelsammelhalterung
-1623m Electrical installation AP
-6900x device junction box (masonry/cavity wall)
lighting
-232x Feuchtraumleuchte
-154x Wandanbauleuchte
-147x Pendant Lamp
-4x Wandeinbauleuchte
grounding system
-7250m NHXMH line
-755x pipe clamps
-40x Potenzialausgleichsschiene
-400x Potentialausgleichsanschluss
telecommunications systems
-12x FM-Verteilerkasten
-8400m Netzwerkleitung Cat7
-150x junction box RJ45
Haussprechanlage
-2x Haubenverteiler
-9x Haustürstation
-132x Klingeltaster
-2x free-standing letterbox system
-11400m J-H(St)H lines
outdoor facilities
-2150m N2XH-J lines
-10x LED Pollerleuchte
-5x LED Lichtstele
-2x LED wall lamp
-4x LED Feuchtraumleuchte
-1500m Installationsrohr
Charging
-4x Ladesäule R200
-2x charging station for bicycles
-250m N2XH-J line
underground car park
-1x Installationsverteiler (144 PLE)
-485m NHXMH-J lines
-160m main/line lines
-175m cable routing (cable tray / installation duct)
-150m Installationsrohr
-31x LED Feuchtraumleuchte
-9x LED Wandanbauleuchte
-15x Installationsgerät
-13x Sicherheitsbeleuchtung
-1x Ladesäule R200
Rampenheizung
-185,5m2 Freiflächenheizung
-550m connection cable
Part of the tender is also a maintenance contract (inspection and maintenance), which is to be concluded for a period of 4 years after acceptance.