Joint task Improving the Regional Economic Structure (GRW)
Tourism development of the GRW-Infra 09/18 Botanical Museum, BAFA project no. 48/11/5009,
here: painting and varnishing work
Joint task Improving the Regional Economic Structure (GRW)
Tourism development of the GRW-Infra 09/18 Botanical Museum, BAFA project no. 48/11/5009,
here: painting and varnishing work
The building is a historical monument.
Scope:
-Working platforms for own performance Working height up to 9.60 m
-Sampling
-500 m2 Protective flooring
-3650 m2 protect components
-4357 m2 walls substrate pretreatment, full-surface filling, coating with lime paint and dispersion silicate paint
-160 m supports, w/h=0.49/0.49 m to w/h=1.09/0.70 m, substrate pretreatment, full-surface filling, coating with lime paint
-1674 m reveals, t= 20-70 cm, substrate pre-treatment, full-surface filling, coating with lime paint
-307 m beams, w/h= 55-60/15 cm to w/h= 55-60/140-190 cm, partly with arch, substrate pre-treatment, full-surface filling, coating with lime paint
-2500 m2 ceilings substrate pre-treatment, full-surface filling, coating with lime paint
-44 m2 fire protection coating steel beam
-26 m front edges ceilings, H= 30 cm, substrate pre-treatment, full-surface filling, coating with lime paint
-3000 m grouting
-1000 m coating, heating pipes