Consultancy and services in the detection of building pollutants, as well as the professional handling of hazardous or non-hazardous waste or building pollutants, taking into account occupational health and safety, as well as implementation of waste management for the waste producer and owner in the event of disposal.
In some properties, legal representatives are currently still tied. A detailed overview can be found in the tender documents.
BIM Berliner Immobilienmanagement GmbH (BIM) manages approx. 5000 buildings in several properties and carries out construction measures in them. Since these buildings are buildings of different construction periods, situations often arise in the course of this management and construction activity that require a test for building pollutants. Especially in the case of buildings in use, responsible and, above all, short-term action is required.
BIM intends to achieve a uniform and smooth process for the detection, dismantling, occupational health and safety requirements and disposal of building pollutants by awarding the consulting/services described below. As a result, the health protection of our users, contractors and employees should be maintained with the highest priority and fast response times.
The legal duties and responsibilities incumbent on waste producers and owners in the handling of hazardous substances are to be regulated and safeguarded by means of expert advisory services, including clear regulations for the awarding of services to third parties.
By developing high-quality expertise and renovation concepts, a targeted and economical handling of building pollutants should be achieved when remaining or with necessary construction measures, repairs and accidents.
Compliance with the legal framework, which enables the unhindered and safe implementation of work in contaminated areas, is also the focus here. Main tasks:
1. Assessment of the risk of the presence of contaminants
2. Preparation of a pollutant report
3. Advice on planning
4. Creation of a dismantling and disposal concept
5. Participation in or implementation of the preparation of the award
6. Participation in the awarding of demolition and disposal services
7. Construction supervision with regard to demolition and disposal of pollutants
8. Takeover of waste management for the Client
9. Preparation of the waste balances / final documentation.
The tender comprises 5 lots prepared by the Client (Annex 1_3_Uebersicht_Lose). Once the applications for participation have been evaluated, all suitable candidates will be invited to submit their bids. Against the background of price determination, the bidders will submit a bid for each item in the indicative bidding phase for the specified prices of the bill of quantities. On this basis, the Client will determine the median in each position in the course of the bid evaluation. The new unit prices established by the Client will be submitted to the bidders as an offer with reference to all components of the framework agreement.
After acceptance of the offer by the bidders, the Client will determine the framework contract partner for the respective sublot 1-5 in the course of a lottery procedure in the respective sub-lots 1-5. For this purpose, the first step is to look at the partial lot with the lowest number of applicants. If the lot has fallen on a bidder, he can no longer be awarded a further contract and will not be considered in the lottery procedures for the remaining partial lots, if he has also applied at that time. In the second step, the lot with the lowest number of applicants is considered and the procedure is repeated, as described in the previous paragraph. The described procedure is carried out in each lot as described until a framework contractor has been assigned to all lots. If all lots have the same number of applicants or if there are several lots with the same number of applicants, the order of the lots to be awarded begins with the smallest partial lot of the number of properties included.
If there is only one candidate in a partial lot, he or she will be awarded the partial lot and will not be taken into account in the further awarding of the contract.
BIM Berliner Immobilienmanagement GmbH (BIM) manages approx. 5000 buildings in several properties and carries out construction measures in them. Since these buildings are buildings of different construction periods, situations often arise in the course of this management and construction activity that require a test for building pollutants. Especially in the case of buildings in use, responsible and, above all, short-term action is required.
BIM intends to achieve a uniform and smooth process for the detection, dismantling, occupational health and safety requirements and disposal of building pollutants by awarding the consulting/services described below. As a result, the health protection of our users, contractors and employees should be maintained with the highest priority and fast response times.
The legal duties and responsibilities incumbent on waste producers and owners in the handling of hazardous substances are to be regulated and safeguarded by means of expert advisory services, including clear regulations for the awarding of services to third parties.
By developing high-quality expertise and renovation concepts, a targeted and economical handling of building pollutants should be achieved when remaining or with necessary construction measures, repairs and accidents.
Compliance with the legal framework, which enables the unhindered and safe implementation of work in contaminated areas, is also the focus here. Main tasks:
1. Assessment of the risk of the presence of contaminants
2. Preparation of a pollutant report
3. Advice on planning
4. Creation of a dismantling and disposal concept
5. Participation in or implementation of the preparation of the award
6. Participation in the awarding of demolition and disposal services
7. Construction supervision with regard to demolition and disposal of pollutants
8. Takeover of waste management for the Client
9. Preparation of the waste balances / final documentation.
The tender comprises 5 lots prepared by the Client (Annex 1_3_Uebersicht_Lose). Once the applications for participation have been evaluated, all suitable candidates will be invited to submit their bids. Against the background of price determination, the bidders will submit a bid for each item in the indicative bidding phase for the specified prices of the bill of quantities. On this basis, the Client will determine the median in each position in the course of the bid evaluation. The new unit prices established by the Client will be submitted to the bidders as an offer with reference to all components of the framework agreement.
After acceptance of the offer by the bidders, the Client will determine the framework contract partner for the respective sublot 1-5 in the course of a lottery procedure in the respective sub-lots 1-5. For this purpose, the first step is to look at the partial lot with the lowest number of applicants. If the lot has fallen on a bidder, he can no longer be awarded a further contract and will not be considered in the lottery procedures for the remaining partial lots, if he has also applied at that time. In the second step, the lot with the lowest number of applicants is considered and the procedure is repeated, as described in the previous paragraph. The described procedure is carried out in each lot as described until a framework contractor has been assigned to all lots. If all lots have the same number of applicants or if there are several lots with the same number of applicants, the order of the lots to be awarded begins with the smallest partial lot of the number of properties included.
If there is only one candidate in a partial lot, he or she will be awarded the partial lot and will not be taken into account in the further awarding of the contract.
BIM Berliner Immobilienmanagement GmbH (BIM) manages approx. 5000 buildings in several properties and carries out construction measures in them. Since these buildings are buildings of different construction periods, situations often arise in the course of this management and construction activity that require a test for building pollutants. Especially in the case of buildings in use, responsible and, above all, short-term action is required.
BIM intends to achieve a uniform and smooth process for the detection, dismantling, occupational health and safety requirements and disposal of building pollutants by awarding the consulting/services described below. As a result, the health protection of our users, contractors and employees should be maintained with the highest priority and fast response times.
The legal duties and responsibilities incumbent on waste producers and owners in the handling of hazardous substances are to be regulated and safeguarded by means of expert advisory services, including clear regulations for the awarding of services to third parties.
By developing high-quality expertise and renovation concepts, a targeted and economical handling of building pollutants should be achieved when remaining or with necessary construction measures, repairs and accidents.
Compliance with the legal framework, which enables the unhindered and safe implementation of work in contaminated areas, is also the focus here. Main tasks:
1. Assessment of the risk of the presence of contaminants
2. Preparation of a pollutant report
3. Advice on planning
4. Creation of a dismantling and disposal concept
5. Participation in or implementation of the preparation of the award
6. Participation in the awarding of demolition and disposal services
7. Construction supervision with regard to demolition and disposal of pollutants
8. Takeover of waste management for the Client
9. Preparation of the waste balances / final documentation.
The tender comprises 5 lots prepared by the Client (Annex 1_3_Uebersicht_Lose). Once the applications for participation have been evaluated, all suitable candidates will be invited to submit their bids. Against the background of price determination, the bidders will submit a bid for each item in the indicative bidding phase for the specified prices of the bill of quantities. On this basis, the Client will determine the median in each position in the course of the bid evaluation. The new unit prices established by the Client will be submitted to the bidders as an offer with reference to all components of the framework agreement.
After acceptance of the offer by the bidders, the Client will determine the framework contract partner for the respective sublot 1-5 in the course of a lottery procedure in the respective sub-lots 1-5. For this purpose, the first step is to look at the partial lot with the lowest number of applicants. If the lot has fallen on a bidder, he can no longer be awarded a further contract and will not be considered in the lottery procedures for the remaining partial lots, if he has also applied at that time. In the second step, the lot with the lowest number of applicants is considered and the procedure is repeated, as described in the previous paragraph. The described procedure is carried out in each lot as described until a framework contractor has been assigned to all lots. If all lots have the same number of applicants or if there are several lots with the same number of applicants, the order of the lots to be awarded begins with the smallest partial lot of the number of properties included.
If there is only one candidate in a partial lot, he or she will be awarded the partial lot and will not be taken into account in the further awarding of the contract.
BIM Berliner Immobilienmanagement GmbH (BIM) manages approx. 5000 buildings in several properties and carries out construction measures in them. Since these buildings are buildings of different construction periods, situations often arise in the course of this management and construction activity that require a test for building pollutants. Especially in the case of buildings in use, responsible and, above all, short-term action is required.
BIM intends to achieve a uniform and smooth process for the detection, dismantling, occupational health and safety requirements and disposal of building pollutants by awarding the consulting/services described below. As a result, the health protection of our users, contractors and employees should be maintained with the highest priority and fast response times.
The legal duties and responsibilities incumbent on waste producers and owners in the handling of hazardous substances are to be regulated and safeguarded by means of expert advisory services, including clear regulations for the awarding of services to third parties.
By developing high-quality expertise and renovation concepts, a targeted and economical handling of building pollutants should be achieved when remaining or with necessary construction measures, repairs and accidents.
Compliance with the legal framework, which enables the unhindered and safe implementation of work in contaminated areas, is also the focus here. Main tasks:
1. Assessment of the risk of the presence of contaminants
2. Preparation of a pollutant report
3. Advice on planning
4. Creation of a dismantling and disposal concept
5. Participation in or implementation of the preparation of the award
6. Participation in the awarding of demolition and disposal services
7. Construction supervision with regard to demolition and disposal of pollutants
8. Takeover of waste management for the Client
9. Preparation of the waste balances / final documentation.
The tender comprises 5 lots prepared by the Client (Annex 1_3_Uebersicht_Lose). Once the applications for participation have been evaluated, all suitable candidates will be invited to submit their bids. Against the background of price determination, the bidders will submit a bid for each item in the indicative bidding phase for the specified prices of the bill of quantities. On this basis, the Client will determine the median in each position in the course of the bid evaluation. The new unit prices established by the Client will be submitted to the bidders as an offer with reference to all components of the framework agreement.
After acceptance of the offer by the bidders, the Client will determine the framework contract partner for the respective sublot 1-5 in the course of a lottery procedure in the respective sub-lots 1-5. For this purpose, the first step is to look at the partial lot with the lowest number of applicants. If the lot has fallen on a bidder, he can no longer be awarded a further contract and will not be considered in the lottery procedures for the remaining partial lots, if he has also applied at that time. In the second step, the lot with the lowest number of applicants is considered and the procedure is repeated, as described in the previous paragraph. The described procedure is carried out in each lot as described until a framework contractor has been assigned to all lots. If all lots have the same number of applicants or if there are several lots with the same number of applicants, the order of the lots to be awarded begins with the smallest partial lot of the number of properties included.
If there is only one candidate in a partial lot, he or she will be awarded the partial lot and will not be taken into account in the further awarding of the contract.
BIM Berliner Immobilienmanagement GmbH (BIM) manages approx. 5000 buildings in several properties and carries out construction measures in them. Since these buildings are buildings of different construction periods, situations often arise in the course of this management and construction activity that require a test for building pollutants. Especially in the case of buildings in use, responsible and, above all, short-term action is required.
BIM intends to achieve a uniform and smooth process for the detection, dismantling, occupational health and safety requirements and disposal of building pollutants by awarding the consulting/services described below. As a result, the health protection of our users, contractors and employees should be maintained with the highest priority and fast response times.
The legal duties and responsibilities incumbent on waste producers and owners in the handling of hazardous substances are to be regulated and safeguarded by means of expert advisory services, including clear regulations for the awarding of services to third parties.
By developing high-quality expertise and renovation concepts, a targeted and economical handling of building pollutants should be achieved when remaining or with necessary construction measures, repairs and accidents.
Compliance with the legal framework, which enables the unhindered and safe implementation of work in contaminated areas, is also the focus here. Main tasks:
1. Assessment of the risk of the presence of contaminants
2. Preparation of a pollutant report
3. Advice on planning
4. Creation of a dismantling and disposal concept
5. Participation in or implementation of the preparation of the award
6. Participation in the awarding of demolition and disposal services
7. Construction supervision with regard to demolition and disposal of pollutants
8. Takeover of waste management for the Client
9. Preparation of the waste balances / final documentation.
The tender comprises 5 lots prepared by the Client (Annex 1_3_Uebersicht_Lose). Once the applications for participation have been evaluated, all suitable candidates will be invited to submit their bids. Against the background of price determination, the bidders will submit a bid for each item in the indicative bidding phase for the specified prices of the bill of quantities. On this basis, the Client will determine the median in each position in the course of the bid evaluation. The new unit prices established by the Client will be submitted to the bidders as an offer with reference to all components of the framework agreement.
After acceptance of the offer by the bidders, the Client will determine the framework contract partner for the respective sublot 1-5 in the course of a lottery procedure in the respective sub-lots 1-5. For this purpose, the first step is to look at the partial lot with the lowest number of applicants. If the lot has fallen on a bidder, he can no longer be awarded a further contract and will not be considered in the lottery procedures for the remaining partial lots, if he has also applied at that time. In the second step, the lot with the lowest number of applicants is considered and the procedure is repeated, as described in the previous paragraph. The described procedure is carried out in each lot as described until a framework contractor has been assigned to all lots. If all lots have the same number of applicants or if there are several lots with the same number of applicants, the order of the lots to be awarded begins with the smallest partial lot of the number of properties included.
If there is only one candidate in a partial lot, he or she will be awarded the partial lot and will not be taken into account in the further awarding of the contract.