This contract concerns the execution of execution studies and ventilation and fluids works (lot 3) relating to the renovation of INB 37A, within the framework of the Pagode project.
The service, subject of this contract, is described in the specific technical specifications, supplemented by the general technical specifications, and the documents constituting the DCE as cited in article 2 of the draft contract. It must be carried out in accordance with the prescriptions, standards, laws and regulations in force.
The service includes:
- the supply of deliverables described in the specifications of the specific technical clauses,
- the supply of the deliverables described in the general technical specifications,
- site surveys and the appropriation of existing equipment,
- the achievement of the aeraulic point 0 of the MI ventilation,
- the studies described in the particular technical specifications necessary for the performance of the work,
- supplies, production and supply of equipment,
- carrying out factory tests representative of the conditions of use and performance expected on site,
- delivery, handling, assembly and site testing of equipment, including air rebalancing following modification of existing equipment,
- regulatory controls (sheath tightness, electricity, etc.),
- filter efficiency tests,
- the supply of a supervision station specific to lot 3, with pages specific to each system,
- training of personnel in the operation and maintenance of equipment,
- carrying out all of the missions described in the general technical specifications (control of deadlines, control of invoicing, control of configuration, quality management, monitoring of safety requirements, compliance with and monitoring of environmental requirements, carrying out inspections, compliance with technical requirements, compliance with site organization and intervention methods in BNI 37A, etc.),
- packaging and disposal of waste in accordance with the waste management procedure, and, more generally,
- the supply of all the equipment necessary for carrying out the work specified in the specifications,
- the contractual documentation in French, and in particular the file of works executed (DOE) which conditions the acceptance of the contract,
- the associated conformity certificates,
- all the subjugations linked to a service taking place on a CEA site (formalities of access to the center, prevention plans, DOT, DIMR, medical follow-up of the intervening personnel and the previous training sessions),
- protection of existing structures and securing of the site,
- participation in meetings with the CEA and / or the MOE described in the general technical specifications and the draft contract in paragraph 4.7,
- keeping the premises and premises where the work is carried out clean.