Engineering services | Tenderlake

Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 March 2023
Closing Date:
20 April 2023
Location(s):
FRL03 Alpes-Maritimes (FR FRANCE)
Description:
project management mission relating to the renewal of the building management system (BMS) and related works (renovation of the BMS room)

project management mission relating to the renewal of the building management system (BMS) and related works (renovation of the BMS premises) of the Palais des Festivals et des Congrès de Cannes.The work to be carried out belongs to the category of building works: reuse/rehabilitation. The work programme can be downloaded from SEMEC's buyer profile at the following address: https://www.marches-securises.fr (Client: Palais des Festivals et des congrès_06) The part of the estimated financial envelope allocated to the works is 1,500,000 euros (excluding VAT). The execution of the works is planned in phases, mainly during the summer season, from 2024 to 2026.The work will be carried out on an occupied site. It should be noted that they will be carried out in parallel with renovation work, led by the city of Cannes and/or SEMEC. ERP type t, l, n, p, w, PaCategory: 1st

the consultation will give rise to a project management contract, pursuant to Articles L. 2430-1, L. 2431-1 to L. 2431-3, L. 2432-1, L. 2432-2, R.2172-3 of the Public Order Code. The project management team will be entrusted with a project management mission as defined in Article R. 2431-1 of the Public Order Code: -aps / preliminary summary project,-apd / final preliminary project,-pro / project,-act / assistance to works contracts,-syn - visa / Synthesis and Visa (realization of synthesis studies resulting in synthesis plans, and approval of the conformity to the project of the execution studies made by the contractor),-det / direction of the execution of the works contracts,-aor / assistance to the acceptance operations.- The following additional mission elements:-d IAG / Diagnosis,-Opc / Scheduling, steering and coordination.As an indication, the estimated date of notification of the contract and, therefore, of the start of the studies, is mid-September 2023.la overall duration of execution of the project management contract indicated in section Ii.2.7 includes the 12-month guarantee of perfect completion of the last works. The overall duration being a function of the duration of execution of the works, the latter is given only as an indication. Only the duration of the various mission elements indicated in the consultation documents is contractual. Procedure with negotiation pursuant to Art. R. 2124-1, R. 2124-3-3°, and R. 2161-12 to R. 2161-20 of the Public Order Code

Download full details as .pdf
The Buyer:
s.e.m.e.c
CPV Code(s):
71300000 - Engineering services
71320000 - Engineering design services
71335000 - Engineering studies