TB 7 Bastion VII, LoS 02 gardening and landscaping.
— 53 m construction fence,
— 152 sqm of demolition asphalt concrete including base layer,
— 80 m demolition of bezels,
— 630 cbm of excavation and recovery from waste deposits,
— 1,400 sqm of land profiling in vegetation areas, of which
— 590 sqm of terrain profiling in the embankment area,
— 850 sqm of floor replacement d 30 cm with recycled building material,
— 850 sqm geotextile,
— 850 sqm Geogrid,
— 850 sqm of fine planum in pathways,
— supply and install 220 cbm antifreeze layer,
— supply and install 116 cbm of ballast base layer,
— 150 sqm of asphalt work,
— 190 sqm of natural stone pavement granite porphyry in unbound construction,
— 335 sqm of water-based pathways,
— 38 sqm of gravel ceiling,
— 59 m edging high curb/deep-curb,
— 72 m granite porphyry edging,
— 20 m enclosure with gate systems,
— 32 m Small retaining wall made of natural stone sandstone height up to 50 cm,
— 1 stair system natural stone sandstone with 3 slopes,
— 35 m drainage pipe,
— 7 pcs. road drains and drainage channels incl. connection,
— 6 pcs. foundation works for electrical installation,
— Install 6 pieces of waste bins, bicycle hangers and benches inlc. Foundations
— supply and cover 57 cbm of topsoil for meadows,
— supply and cover 3 cbm of perennial substrate,
— 1 380 sqm of meadow sowing,
— 84 perennials supply and plants,
— supply and plant 150 pieces of flower bulbs,
completion maintenance in the year of completion,
Development care for 2 years.