B29 FDE Urbach - Lorch: FDE, drainage, vehicle restraint systems and building rehabilitation, carried out according to BIM methodology
positionTraffic safety for maintenance measures in road construction.
Execution of the construction project with the use of various Applications
Traffic routing for eight construction phases differing. Forms of traffic management (e.g. 2+0, 1+1, 2+2n). Length of working area = 11 km
Tendered performanceRestraint systems for maintenance measures in road construction.
Execution of the construction project with the use of various Applications
Renewal of the restraint systems in the central strip in the area of the open track and the structures as well as in the side area. Total length of the renovation = approx. 8 km
Tendered performanceWork on drainage, work on civil engineering structures and the roadway in road construction
Provision of a collaboration platform
Provision of the overall BIM coordinator
Execution of the construction project with the use of various Applications
Milling and paving approx. 170,000 m² of asphalt pavement
Milling and paving approx. 170,000 m² of asphalt binder
Renewal of the longitudinal pipe of the central strip canal over approx. 7 km including renewal of the inlet shafts and inlet bays.
Construction of a monolithic gutter system over approx. 4 km.
Renewal of the roadway joints by means of steel storeys and replacement of the bituminous roadway joints, concrete repair of the abutments and pillars on approx. 20 structures.
Demarcation and creation of release markings over approx. 35 km (width = 0.3 m) and approx. 15 km (width = 0.15 m).
Tendered performanceRoad markings in the course of a maintenance measure in road construction
Execution of the construction project with the use of various Applications
Demarcation and creation of the final marking over approx. 35 km (width = 0.3 m) and approx. 15 km (width = 0.15 m).