For the construction of a new three-tier secondary school with a doubtful sports hall, carpentry work is required for the production of fixtures and signage.
- Wall coverings tlw. perforated u. tlw. with fire protection requirements approx. 1100 m2
- Wall cladding auditorium: approx. 80 m2
- Ceiling cladding auditorium: approx. 180 m2
- Acoustic panel auditorium: approx. 280 m2
- Metallbaffeldecke: ca. 70 m2
- Benches various lengths and heights approx. 21 pieces
- Seat stars 10 pieces
- Media panels approx. 24 pieces
- Lifting wall incl. cladding: 1 piece
- Wall display cases: 2 pieces
- Adhesive films / continuous protection
- Signage