GSW Gemeinschaftsstadtwerke GmbH intends to build a new combined swimming pool on the site of the current outdoor swimming pool. The slabs are made of reinforced concrete (in-situ concrete on site) as well as in parts (in the area of the bathing halls) of glued timber truss roof construction to be erected with respective roof formwork. The roof structure of the indoor pool must be aligned for the areas of the sports pool and the family area (multi-purpose pool and children's pool).
8 pcs. roof truss GLC28c approx. 23.60 m single length, trapezoidal 100-155 cm
1,600 m KVH purlin position sports pool
ca. 900 m² Dachschalung OSB, d=25mm
5 pcs. Creation of roof openings
8 pcs. roof truss GLC28c approx. 23.60 m single length, trapezoidal (3% inclination) 100-120 cm
1.100 m KVH Pfettenlage Familienbecken
ca. 660 m² Dachschalung OSB, d=25mm
2 pcs. Creation of roof openings