Energie und Wasser Potsdam GmbH would like to plan a clear water heat pump at the site of the northern sewage treatment plant.
In summary, the request includes the following technical content:
- A clear water heat pump with approx. 3 MWth./1.3 MWel.
- The peripheral systems required to operate the heat pump (MSHV, NSHV, if applicable, etc. Soft start system, transformer, ventilation systems, hydraulics)
- The supply and discharge on the site of the sewage treatment plant
- The building envelope (functional construction)
- The consideration of a placeholder for ozonation/trace substance removal/4th cleaning stage in the building (second building section). Parallel planning is commissioned by EWP, coordination and incorporation of external planning
- Consideration of the space requirements and the connection options in the energy center for a deep geothermal plant to be realized later
- Dimensioning/planning of the district heating connection (handover to sewage treatment plant site)