Renovation of the heritage school site including:
-Renovation of the School building: new developments in the vestibules of the School building; Benches and hooks (66 ml), bleachers (190 m2), skirting boards and wall lists (310ml), partitions in elements (40 ml) with doors (34 pcs).
- Renovation of the building of the Gym: acoustic panel coating (50m2), partitions (15 ml).
Renovation of the heritage school site including:
-Renovation of the School building: new developments in the vestibules of the School building; Benches and hooks (66 ml), bleachers (190 m2), skirting boards and wall lists (310ml), partitions in elements (40 ml) with doors (34 pcs).
- Renovation of the building of the Gym: acoustic panel coating (50m2), partitions (15 ml).