Computerized and high current installation for digitization in schools and educational institutions, primary and secondary schools, Schwabacher Str. 86-88.
Computer and power installation:
Main amounts:
— approx. 2 distribution systems (01.01),
— approx. 100 built-in equipment/safety equipment (01.02),
— approx. 1 200 m of Lay systems (01.03),
— approx. 34 000 m of power and low-current cable (01.04),
— approx. 850 installation devices (01.05),
— approx. 400 IT components (01.06)
— approx. 150 fire bulkheads (01.07).