2 pcs parking space for one vehicle, suction slot duct
3 pcs parking space for two vehicles, suction slot duct
Exhaust fan (outdoor) incl. control
CO extraction systems
2 pcs parking space for one vehicle, suction slot duct
3 pcs parking space for two vehicles, suction slot duct
Exhaust fan (outdoor) incl. control
Execution times: 15.12.2023 - 29.08.2024 according to schedule
- Werkplanung: 15.12.2023 - 30.01.2024
- Provision of large roof components: 01.02.2024 - 05.02.2024
- Installation in the vehicle hall: 16.08.2024 - 29.08.2024